Burndown Chart Calculator (ideal line, burn rate & projected finish)

Results update as you type.

Your numbers

Understanding the burndown chart calculator — concept and principle

This calculator gives the key numbers behind a sprint burndown chart: the ideal work remaining today, how far ahead or behind you are, the actual and required burn rates, and the projected finish day at the current pace. Scrum masters and agile teams use it in stand-ups and sprint reviews to see early whether the sprint goal is still realistic.

Sprint pace: ideal vs actualSprint pace: ideal vs actual: Ideal 8 pts/day (32 points should remain); Actual 6.67 pts/day (40 points remain on day 6) → Day 12 (2 days over · need 10/day)Sprint pace: ideal vs actualIdeal 8 pts/day32 points should remainActual 6.67 pts/day40 points remain on day 6Day 122 days over · need 10/day
Sprint pace: ideal vs actual — with the default inputs: Day 12.

How it is calculated

Work can be in story points or hours; days are working days.

The principle

A burndown chart plots work remaining on the vertical axis against time. The ideal line runs straight from the total at day 0 to zero on the last day, assuming an even pace. The actual line shows what really happened. Extending the average pace so far is a simple linear forecast: if the team keeps burning at the same rate, the remaining work will be finished after remaining ÷ rate more days. If work is added mid-sprint, remaining work can rise; a burnup chart with a separate scope line shows that more clearly.

Worked example

Defaults: 80 points, 10-day sprint, 6 days elapsed, 40 points remaining.

  1. Ideal remaining = 80 × (1 − 6 ÷ 10) = 32.
  2. Behind ideal by 40 − 32 = 8 points.
  3. Ideal burn rate = 80 ÷ 10 = 8 per day; actual = (80 − 40) ÷ 6 = 6.67 per day.
  4. Projected finish = 6 + 40 ÷ 6.667 = 6 + 6 = day 12, which is 2 days over.
  5. Burn rate needed = 40 ÷ 4 = 10 per day.
  6. Status: Behind — will overrun at the current pace.

How to read the result

If the needed rate is far above anything the team has achieved, adjust scope with the product owner rather than hoping for a late sprint. A small lag early in the sprint is common, because work often finishes in batches near the end. A flat line for several days usually signals blocked work or tasks that are too large to show progress.

Common mistakes

Keep in mind: The projection is a straight-line extrapolation of past pace. Use it as an early signal for a conversation, not as a performance measure for individuals.

Frequently asked questions

What is the difference between a burndown and a burnup chart?

A burndown shows work remaining falling to zero; a burnup shows work completed rising toward a scope line, which makes scope changes visible.

Can I use hours instead of story points?

Yes. Use the same unit for total and remaining work.

Why is my burndown flat at the start?

Teams often start several stories at once and finish them later, so little is marked done in the first days.

Sources: Agile Alliance, Agile Glossary, "Burndown Chart"

Checked 9 Nov 2026. Burndown chart (work remaining on the vertical axis against time elapsed; sprint and product burndown; burnup variant): Agile Alliance, Agile Glossary, “Burndown Chart”. Ideal line and projection by the average burn rate: standard linear formulas.