Man-Hours Calculator (crew size, days & job hours)

Results update as you type.

Your numbers

Understanding the man-hours calculator — concept and principle

This calculator works out how many man-hours (person-hours) a crew provides, how many of them are productive, and, for a job of known size, how many workers or days you need. Site managers, contractors, event organisers and project planners use it to staff jobs and check schedules.

People × hours × daysPeople × hours × days: 6 × 8 × 15 = 720 (total man-hours (90 man-days)); 720 × 85% = 612 (productive hours for a 600 h job) → 12 h to spare (job needs 14.7 days with 6 people)People × hours × days6 × 8 × 15 = 720total man-hours (90 man-days)720 × 85% = 612productive hours for a 600 h job12 h to sparejob needs 14.7 days with 6 people
People × hours × days — with the default inputs: 12 h to spare.

How it is calculated

The principle

A man-hour is one person working for one hour, the basic unit of labour input used in labour statistics and planning. Multiplying crew size by hours and days gives the total time bought. Not every paid hour goes into the job: breaks, setup, travel and waiting take a share, which is why the productive share matters. The arithmetic assumes the work can be shared evenly among people. That is true for many tasks but not all: adding people to work that cannot be split, or that needs training and coordination, does not shorten it in proportion.

Worked example

Defaults: 6 workers, 8 hours a day, 15 days, 85% productive, job of 600 productive hours.

  1. Total man-hours = 6 × 8 × 15 = 720; man-days = 720 ÷ 8 = 90.
  2. Productive man-hours = 720 × 0.85 = 612.
  3. Workers needed = 600 ÷ (8 × 15 × 0.85) = 600 ÷ 102 = 5.88, rounded up to 6.
  4. Days needed with 6 workers = 600 ÷ (6 × 8 × 0.85) = 600 ÷ 40.8 = 14.7.
  5. Hours left over = 612 − 600 = 12.
How Total man-hours changes with Number of workersHow Total man-hours changes with Number…05001,0001,5001.534.567.5912Example: 720Number of workers
Each point is the calculator re-run with only “Number of workers” changed; the gold point is the default example. Change the inputs above and this chart follows your numbers.
Number of workersTotal man-hours
1.5180
3360
4.5540
6720
7.5900
91,080
121,440

How to read the result

A small positive leftover, as here, means the plan works but with little slack: about one and a half crew-days. A negative figure means the crew will run short unless you add people, extend hours or days, or raise productivity. When planning critical jobs, keep a margin for sickness, weather and rework.

Common mistakes

Keep in mind: Labour law limits working hours and requires rest. Check local rules before planning long days or weeks.

Frequently asked questions

What is a man-hour?

One person working for one hour. Many organisations now use the neutral term person-hour.

How do I convert man-hours to man-days?

Divide by the hours in a working day, here 8.

Why does adding workers not always speed up a job?

Some tasks cannot be split, and extra people need coordination and space.

Sources: U.S. Bureau of Labor Statistics, hours-worked measures (person-hours as a unit of labour input)

Checked 9 Nov 2026. Definition of the person-hour as a unit of labour input (hours worked × persons, as in national labour statistics such as the BLS hours-worked measures); planning arithmetic only.