Mortar & Plaster Mix Calculator (cement : sand)

Results update as you type.

Your numbers

Understanding the mortar and plaster mix calculator — concept and principle

This calculator converts a volume of wet mortar or plaster into the amount of cement (in kg and 25 kg bags) and sand (in m³) for a cement : sand mix ratio by volume, such as 1 : 4. Use it to order materials for bricklaying, rendering, plastering or screeding.

Cement and sand for 0.5 m³ of 1:4 mortar0.5 m³ of wet mortar needs 0.665 m³ of dry mix; split into 5 parts of 0.133 m³, one is cement (191.5 kg, 8 bags) and four are sand (0.532 m³).1 : 4 means five equal buckets0.5 m³ wet × 1.33 = 0.665 m³ drydry mix shrinks when water fills the gaps0.665 ÷ 5 parts = 0.133 m³ eachcementsandsandsandsandCement 191.5 kg0.133 × 1,440 kg/m³Sand 0.532 m³0.133 × 48 bags of 25 kg cement
One bucket of cement to four of sand; 191.5 kg of cement rounds up to 8 bags.

How it is calculated

Volumes are in cubic metres; the ratio is by volume, as it is usually specified on site.

The principle

Dry cement and sand contain a lot of air between their grains. When water is added and the mix is worked, the fine cement particles fill the gaps between sand grains and the air is driven out, so the wet mortar takes up noticeably less space than the loose dry ingredients. Multiplying by about 1.33 (a third more) is a common rule of thumb to restore the dry volume needed. That dry volume is then shared out by the parts of the ratio. Cement is converted to mass with its loose bulk density of about 1,440 kg/m³, the figure traditionally used in quantity estimating.

Worked example

  1. Inputs: wet volume 0.5 m³, mix 1 : 4.
  2. Dry volume = 0.5 × 1.33 = 0.665 m³.
  3. One part = 0.665 ÷ 5 = 0.133 m³.
  4. Cement = 0.133 × 1 × 1,440 = 191.52 kg; bags = 191.52 ÷ 25 = 7.66, rounded up to 8 bags.
  5. Sand = 0.133 × 4 = 0.532 m³.
How Cement (kg) changes with Sand partHow Cement changes with Sand part1002003004005001234568Example: 191.52Sand part
Each point is the calculator re-run with only “Sand part” changed; the gold point is the default example. Change the inputs above and this chart follows your numbers.
Sand partCement (kg)
1478.8
2319.2
3239.4
4191.52
5159.6
6136.8
8106.4

How to read the result

Richer mixes such as 1 : 3 are stronger and less permeable and are often used for renders or below-ground work; leaner mixes such as 1 : 5 or 1 : 6 are more workable and more forgiving of movement, often with lime or plasticiser added. Sand is sold by the tonne in many places; damp sand bulks up, so a given volume weighs less than dry sharp sand would suggest. Order a little extra sand, as some is lost on site.

Common mistakes

Keep in mind: The 1.33 factor and 1,440 kg/m³ are standard approximations. Actual quantities depend on sand grading, moisture and workmanship, and the required mix for structural or exposed work should come from the design, the product data and local building rules.

Frequently asked questions

What does a 1 : 4 mix mean?

One volume of cement to four volumes of sand, measured loose and dry, before water is added.

Why is the factor 1.33 and not something else?

It is an estimating rule of thumb. Other references use slightly different factors depending on the sand and on whether site wastage is included.

How much water do I add?

Enough to reach a workable consistency; too much water weakens mortar and increases shrinkage.

Sources: BS EN 998-1 and BS EN 998-2: Specification for mortar for masonry (rendering/plastering and masonry mortar), BSI/CEN · PD 6678: Guide to the specification of masonry mortar, BSI

Checked 8 Nov 2026. Typical coverage rates and standard formulas. Always check the product label and local building rules; buy 5–10% extra for waste.