This calculator finds the material removal rate (MRR), the volume of metal cut away per minute, for milling, turning and drilling. It also gives the chip mass per hour from the material density and the time to remove a given volume. Machinists and manufacturing engineers use it to estimate cycle times and spindle power needs.

Material removal rate in millingHow fast the mill eats steela_e · a_p10 mm · 5 mmFeed rate500 mm/minDensity7.85 g/cm³Q = 10 × 5 × 500 = 25,000 mm³/minRemoval rate25 cm³/minChips per hour11.775 kg/hTime for 100 cm³4 min
Width × depth × feed is the volume swept each minute; density turns it into a weight of chips.

How it is calculated

Milling: Q = a_e × a_p × v_f

Turning: Q = v_c × 1,000 × f × a_p

Drilling: Q = (π D² ÷ 4) × f × n

The principle

Every machining operation removes a cross-section of material and moves it at some rate. In milling, the cutter takes a slot a_e wide and a_p deep, and the table feed moves it forward v_f millimetres each minute. In turning, the chip has an area f × a_p and the surface passes the tool at the cutting speed. In drilling, the whole hole area advances by f each revolution. Multiplying area by speed gives volume per minute.

Worked example

Default inputs: milling, a_e = 10 mm, a_p = 5 mm, v_f = 500 mm/min, density 7.85 g/cm³, volume 100 cm³.

  1. Q = 10 × 5 × 500 = 25,000 mm³/min = 25 cm³/min.
  2. In inches: 25,000 ÷ 16,387 = 1.526 in³/min.
  3. Chips = 25 × 7.85 × 60 ÷ 1,000 = 11.775 kg/h.
  4. Time to remove 100 cm³ = 100 ÷ 25 = 4 min.
How Material removal rate (cm³/min) changes with Width of cut ae (mm) — millingHow Material removal rate changes with W…010203040502.557.51012.51520Example: 25Width of cut ae (mm) — milling
Each point is the calculator re-run with only “Width of cut ae (mm) — milling” changed; the gold point is the default example. Change the inputs above and this chart follows your numbers.
Width of cut ae (mm) — millingMaterial removal rate (cm³/min)
2.56.25
512.5
7.518.75
1025
12.531.25
1537.5
2050

How to read the result

Higher MRR means shorter machining time but more cutting force, heat and spindle power. Multiplying MRR by the material's specific cutting energy estimates the power needed. Roughing aims for high MRR; finishing passes use low MRR for accuracy and surface finish.

Common mistakes

Keep in mind: Feeds and speeds must suit the tool, material and machine. Follow tool manufacturer data and machine safety rules.

Frequently asked questions

How do I estimate spindle power from MRR?

Multiply MRR by the specific cutting energy of the material, taken from machining handbooks or tool makers.

What is table feed in milling?

Feed per tooth × number of teeth × spindle speed.

Why does drilling MRR use the full hole area?

The drill removes the whole circular cross-section as it advances.

How much is 1 in³?

16,387.064 mm³ exactly.

Sources: Standard machining relations for MRR in milling, turning and drilling; 1 in³ = 16,387.064 mm³ (exact)

Checked 9 Nov 2026. Material removal rate for milling (ae·ap·vf), turning (vc·f·ap) and drilling (πD²/4·f·n): standard formula. 1 in³ = 16 387.064 mm³ (exact).

🔬 All science & engineering tools →🌍 Calculators by country →